.


:




:

































 

 

 

 


(, ),




Send this cases (bales, bags) back. I cant accept them for shipment

27. () ? When will you finish unloading

(loading) this hold?

28. ? How much of this lot is still left?

29. There is cargo left for another five drafts

30. , It has begun raining we'll have to stop loading

31. ! Stop with the work

32. ! Cover the hatch with the tarpauling

, ()

As soon as it stops raining we'll go on with our loading (unloading)

34. ? When is your dinner time?

35. ? At what time will you resume your work?

)

1. ? What cargo did your tanker carry

last time?

2. We shall have to clean tanks thoroughly

to wash up the tanks

to steam up the tanks

to chip off the tanks

to wipe the walls

3. () ? What is the diameter of your

receiving (discharning) pipes?

() () ... ()

The outside (inside) diameter of our receivery (discharging) pipes is... inches (milimeters)

5. ? What is the diameter of your hoses

6. These hoses are not good

7. ()

It will be necessary to provide our receiving (discharning) pipes with coupling transition tubes

8. ? What pressure shall we keep at the pumps

... - 1 .

You must keep the pressure at the pumps at... Ib. per. sq. inch.

)

1. We shall have to draw up

a statement of shortage

It's necessary to draw up a statement of the ship's draft before and after the loading

We cannot give you a clean receipt for these pieces

We n accept these pieces only with an appropriate reserve in the bill of lading





:


: 2015-09-20; !; : 347 |


:

:

. .
==> ...

1206 - | 1177 -


© 2015-2024 lektsii.org - -

: 0.008 .